Port News

font size:Big  Small    Default

Zhuanghe Port Maritime Administration Base Project (working ship terminal)

Its construction scale is 2 12-meter-high berths for sea conditions patrol ships and a 30-meter berth for B-type patrol ships with a total investment of 60.96 million yuan. The main body of the project has been finished.